EV Charging Time Calculator
Estimate Level 1 or Level 2 AC charging hours from a starting and target charge, usable battery size and the limiting charger power.
How the result changes
Only usable battery capacity changes; all other inputs stay at your current values. The line illustrates the formula across the shown range. This is not a forecast of real-world outcomes.
About this calculation
This EV charging time calculator estimates a constant-power AC charging session, such as charging at home or at a Level 2 post. Enter the vehicle's usable battery capacity, its current and desired charge percentages, the power available from the charging equipment and the car's onboard AC charging limit. The lower power limit controls the calculation. A separate efficiency assumption accounts for electricity drawn from the supply but not stored in the battery. The answer is a planning estimate rather than a promised finish time.
Formula
E_b = C × (s_1 − s_0)/100; E_grid = E_b/(η/100); t = E_grid/min(P_EVSE, P_car)
Worked example
With Usable battery capacity: 60 kWh, Starting charge: 20 %, Target charge: 80 %, AC equipment power: 7.2 kW, Vehicle onboard AC limit: 6.6 kW, Charging efficiency assumption: 90 %, estimated ac charging time is 6.060606 hours.
Choose the right power values
For AC charging, the equipment provides power to the vehicle and the onboard charger converts it for the battery. A 7.2 kW station cannot make a vehicle with a 6.6 kW onboard AC limit accept 7.2 kW continuously. Conversely, a high-rated onboard charger cannot draw more than the supply and equipment allow. Use the lower of the two entered ratings. These fields do not describe DC fast charging, where the power path and taper behavior differ. Check the vehicle manual and installation rating before using a value.
Worked charging example
A usable 60 kWh battery moving from 20% to 80% gains 60 × 0.60 = 36 kWh. At an assumed 90% session efficiency, roughly 40 kWh must come from the supply. With 7.2 kW equipment and a 6.6 kW onboard limit, use 6.6 kW: 40 ÷ 6.6 is about 6.06 hours, or around six hours and four minutes. Entering 11 kW for the station without changing the car's onboard limit would not shorten this model's time.
Avoid double-counting charging losses
The stored-energy output describes energy added to the modeled battery. The supply-energy output is larger when efficiency is below 100%. The time formula uses supply energy divided by AC input power. If a source already reports battery-side charging power, using that as the equipment input and also applying efficiency would count a loss twice. Keep kW, which is a rate, separate from kWh, which is an amount of energy. To estimate a bill, multiply supply kWh by the appropriate tariff in the separate charging-cost calculator.
Interpret a real session cautiously
Charging power can change with temperature, battery state, grid conditions and vehicle control. The usable battery capacity may differ from a manufacturer's rounded nameplate value. An indicated charge percentage is not necessarily a laboratory energy meter. The efficiency field is an explicit assumption, not a fixed property of every car. Charging near full may slow, and idle or connection time is not included. The tool therefore gives a transparent baseline for scheduling, not a charger reservation guarantee.
Check the session boundaries
Target charge must be above starting charge; a zero or negative interval is not a charging session. If you usually stop at 80%, enter 80 rather than computing a full charge you do not plan to complete. Compare several targets to see the extra energy required, but do not assume the real charging curve remains flat at every target. The US Department of Energy notes that capacity, initial charge, internal charger and equipment all affect charging time.
Common questions
Can I use this for a DC fast charger?
No. It models AC charging with an onboard AC limit and a constant average power. DC charging often changes power strongly during a session, so its actual time needs a suitable charge curve.
Sources and references
Inputs
- Usable battery capacity (kWh)
- Starting charge (%)
- Target charge (%)
- AC equipment power (kW)
- Vehicle onboard AC limit (kW)
- Charging efficiency assumption (%)