ReadyCalcs · All calculators · Compare

What Size Generator Do I Need for My House? Calculator

What size generator do I need for my house? Add essential running loads, the largest motor-start surge and an explicit reserve to compare generator ratings.

What Size Generator Do I Need for My House? Calculator

Simultaneous running demand3,400 W
Starting demand during one motor start5,200 W
Planned continuous rating with reserve3,910 W
Planned surge rating with reserve5,980 W

About this calculation

The useful answer to “what size generator do I need for my house?” depends on the circuits you actually intend to run, not house area alone. Add the watts of appliances that may operate together, then account for the brief extra demand when the largest motor starts. This calculator reports continuous and surge requirements separately and lets you add a visible reserve. It is an initial load worksheet, not an electrical installation plan or a generator recommendation for a particular panel.

Formula

P_run = P_always + P_motor; P_start = P_run + P_extra; P_plan = P × (1 + reserve/100)

Worked example

With Other simultaneous running loads: 2500 W, Running load of motor being started: 900 W, Additional start surge above motor running watts: 1800 W, Planning reserve: 15 %, simultaneous running demand is 3,400 W.

List simultaneous loads, not every nameplate in the house

Choose an outage scenario: essentials only, selected rooms or a wider backup plan. Record running watts for lights, refrigerator, electronics, pumps and heating equipment that could be on at the same time. Use manufacturer labels or measured power where available. Do not automatically sum an electric oven, clothes dryer and air conditioner if your plan deliberately prevents their simultaneous use. Conversely, omitting a well pump because it runs intermittently can leave the estimate too small at the moment it starts. The always-on field holds every running load except the motor being modeled separately.

Keep running and starting ratings distinct

A motor can need extra watts for a few seconds when it starts. Enter its normal running watts in the motor field and only the additional starting watts in the surge field. If a label quotes total starting watts, subtract that motor’s running watts first. This prevents counting the motor twice. The simple worksheet assumes one major motor starts while the other listed loads are already running; two motors starting together or a complex electronic load need a different simultaneous scenario. Compare the continuous result with a generator’s rated running output and the surge result with its separately stated starting capability.

Worked example and the reserve setting

Suppose essential nonmotor appliances total 2,500 W, a pump normally uses 900 W and needs an additional 1,800 W to start. The running demand is 3,400 W. The modeled start event is 5,200 W. With a 15% planning reserve, the figures become 3,910 W continuous and 5,980 W surge. A generator advertised as 6,000 starting watts but only 3,500 running watts would miss the planned continuous number, even though its large headline figure looks sufficient. Change the load list when the outage scenario changes; the reserve does not replace a missing appliance.

Check the equipment and installation constraints

Electrical phase, voltage, individual outlet ratings, fuel supply, elevation and generator derating can matter. A whole-home connection requires approved transfer equipment and a qualified installer. Never connect a generator to household wiring through an ordinary outlet, and never operate an engine-driven generator inside a house, garage or near openings because carbon monoxide can be fatal. The calculator does not determine conductor sizes, transfer-switch capacity or local code compliance. Ask a qualified professional to check any permanent or high-load installation against actual nameplate data.

Common questions

Can I size a generator only from square footage?

No. A house area does not reveal which loads will run together or the starting surge of a motor. List actual loads and compare both continuous and surge ratings.

Should I add every motor starting surge?

For one-at-a-time starts, add the largest extra surge to the simultaneous running load. If motors can start together, model that event separately rather than assuming this one-motor result covers it.

Sources and references

Inputs

  • Other simultaneous running loads (W)
  • Running load of motor being started (W)
  • Additional start surge above motor running watts (W)
  • Planning reserve (%)

Related calculators

Start with your task